Project ID:
07-014
Managing Entity:
Celina
Project Name:
CR 5
From:
DNT Extension
To:
SH 289 (Preston Rd)
Length (Miles):
1.89
Type:
Engineering and Construction
Project Description:
Design and construct improvements to CR 5 from the DNT Extension to SH 289 from a 2-lane rural section to a 6-lane divided reinforced concrete street with integral monolithic concrete curbs and underground storm drainage designed to convey the 100-year storm frequency.
Lanes - Existing:
2
Lanes - Proposed:
6
Total Project Cost:
$10,003,000.00
City Participation:
$5,001,500.00
County Participation:
$5,001,500.00
Other Participation:
Other Participating Entity:
Engineering Start Date:
12/1/2009
Engineering End Date:
2/1/2011
Engineering Status:
Contract with BIRKHOFF, HENDRICKS & CONWAY, L.L.P. was approved on 11-9-09.
Construction Start Date:
2/1/2012
Construction End Date:
7/31/2013
Construction Status:
Comments:
Past bond funds from #99-97 CR 56 ($242,000) and #03-121 CR 96 (235,404) were reallocated to fund cost over runs for this project.
The City has approved an Engineering contract with BIRKHOFF, HENDRICKS & CONWAY, L.L.P. BHC should start engineering work by Dec. 1, 2009.
6/21/2010:
Verified by City Manager - Engineering is ongoing and should be completed by Sep. 1, 2011 (15months). Construction schedule is unknown due to funding constraints.
2/7/2011:
Verified By City Manager - Design is ongoing.
1/23/2013:
Verified by city Public Works Director - Design will proceed in 2013. The project was granted RTR funds for construction.
Map:
http://maps.collincountytx.gov/bondrtr.html?pn=07014
Attachments:
Created at 1/6/2009 5:34 PM by
Tracy Homfeld
Last modified at 1/23/2013 9:45 AM by
Tracy Homfeld