Project ID:
07-006
Managing Entity:
Allen
Project Name:
Stacy Rd
From:
Angel Pkwy
To:
FM 1378
Length (Miles):
1.02
Type:
Construction Only
Project Description:
Reconstruct 2-lane roadway to a 4-lane divided
Lanes - Existing:
2
Lanes - Proposed:
4
Total Project Cost:
$980,000.00
City Participation:
$490,000.00
County Participation:
$490,000.00
Other Participation:
Other Participating Entity:
RTR Funds for Construction
Engineering Start Date:
Engineering End Date:
Engineering Status:
Construction Start Date:
Construction End Date:
Construction Status:
Comments:
The City of Allen submitted Stacy Rd for RTR funds. They will use the 07 bond money as their 20% match for RTR Funding. 
 

1/12/2010: TxDOT is doing Engineering. Expect Environmental clearance in early 2010. Right-of-Way acquisition will start after that and should take 9-12 months. Construction to start by late 2010 or early 2011. The City will need to develop 3 party agreement with Fairview, Allen and Collin County.
 
6/21/2010: Confirmed by City Program Tech - TxDOT is doing Engineering. Awaiting Environmental clearance. Right-of-Way aquisition will start after that and should take 9-12 months.
 
1/18/2011: Verified by City Engineer and TxDOT - Public Hearing is scheduled for Feb. 24, 2011.
 
4/20/2011: Verified by City Engineer - TxDOT let date is Sept 2012.
 
1/25/2013: Verified by City Engineer -TxDOT to manage construction.  Currently TxDOT letting date is tentatively Dec 2014.  TxDOT ROW acquisition is underway. 
Map:
http://maps.collincountytx.gov/bondrtr.html?pn=07006
Attachments:
 
 
Created at 1/6/2009 4:44 PM by Tracy Homfeld
Last modified at 1/25/2013 1:07 PM by Tracy Homfeld