Home
Documents and Lists
Create
Site Settings
Help
Collin County Projects
2007 Transportation Bond Projects
: Prosper Trail
New Item
|
Edit Item
|
Delete Item
|
Alert Me
|
Go Back to List
Project ID:
07-078
Managing Entity:
Prosper
Project Name:
Prosper Trail
From:
DNT
To:
Preston Rd
Length (Miles):
1.98
Type:
Engineering and Construction
Project Description:
Prepare Engineering Plans, aquire Right of Way, Utility relocation and Construction of a 4-lane divided concrete curb and gutter roadway from DNT to BNSF Railroad and from Coleman St (Business 289) to Preston Road (SH 289). Construction will also include underground storm sewer.
Lanes - Existing:
2
Lanes - Proposed:
4
Total Project Cost:
$4,435,425.00
City Participation:
$2,217,713.00
County Participation:
$2,217,713.00
Other Participation:
Other Participating Entity:
Engineering Start Date:
Engineering End Date:
6/30/2009
Engineering Status:
Construction Start Date:
10/1/2009
Construction End Date:
5/31/2011
Construction Status:
COMPLETE
Comments:
6/21/2010:
Verified by Town - The utilities are 95% complete. The contractor has paved the west bound lanes between Preston and Coleman and is currently working on backfill and sidewalk prior to opening to traffic. The proposed area between Coleman and the Dallas North Tollway has been limed and paving of this area should commence next week. Construction from Sep. 2009 - May 2011
1-7-2011:
Verified by City CIP Manger - Construction is 97% complete. Opened to traffic around Thanksgiving 2010. Remaining cosmetic itens to be completed within 30 days.
COMPLETE
Map:
http://maps.collincountytx.gov/bondrtr.html?pn=07078
Attachments:
07-078_ProsperTrl_ILA_11-6-08.pdf
Court Order_07-078_ILA.pdf
Created at 1/6/2009 6:53 PM by
Tracy Homfeld
Last modified at 6/17/2011 1:34 PM by
Tracy Homfeld