Collin County Projects
2007 Transportation Bond Projects: Outer Loop: SEGMENT 1
   
New New Item
|
Edit Edit Item
|
Delete Delete Item
|
Alert Me
|
Go Back to List
Project ID:
07-094
Managing Entity:
Collin County
Project Name:
Outer Loop: SEGMENT 1
From:
US 75
To:
SH 121
Length (Miles):
4.89
Type:
Engineering and Construction
Project Description:
Engineer and Construct 2 lane service road of the future Outer Loop From US 75 to SH 121
Lanes - Existing:
0
Lanes - Proposed:
2
Total Project Cost:
City Participation:
County Participation:
$5,025,000.00
Other Participation:
$12,000,000.00
Other Participating Entity:
Regional Toll Revenue Funding
Engineering Start Date:
Engineering End Date:
12/31/2010
Engineering Status:
COMPLETE
Construction Start Date:
1/26/2011
Construction End Date:
8/4/2012
Construction Status:
Construction contract has been awarded and is ongoing.
Comments:
6/21/2010: Engineering is complete. Working on the Advanced Funding Agreement with TxDOT to obtain the Regional Toll Revenue funds. Funds should be in place within 3 months. Should be ready to bid construction of 2 lane service road by late summer.
 
1/19/2011: Construction Contract has been awarded to LH Lacy. Contractor should be mobilizing very soon and project should be completed by Summer 2012.
 
1/26/2011: Notice to proceed was issued today. Contruction end date is Aug. 4, 2012.
 
4/30/2011: Several Box culverts have been installed. Clearing and grading is ongoing.
 
10/31/2011: Construction is ongoing. Continued work on bridge and road surface. Continued Right of Way clearing and fence installation.
 
1/23/2013: The sections from US 75 to SH 5 and from SH 121 west to just before the railroad are completed. The Railroad will be constructing the new crossing this spring to finalize the project.
Map:
http://maps.collincountytx.gov/bondrtr.html?pn=07094
Attachments:
 
 
Created at 1/6/2009 7:00 PM by Tracy Homfeld
Last modified at 1/23/2013 10:45 AM by Tracy Homfeld