Project IDManaging EntityJurisdictionProject NameFromToProject TypeProject DescriptionFilterLanes - ExistingLanes - ProposedEngineering Start DateEngineering End DateEngineering StatusConstruction Start DateConstruction End DateConstruction StatusNCTCOG Contract On fileCommentsFilterMapModified
Modified By
Sum = 55.00
Sum = $1,155,662,933.46
Sum = $602,366,593.00
Sum = $336,678,431.00
Expand/Collapse Managing Entity : Allen ‎(2)
Sum =
Sum = $15,195,028.00
Sum = $6,279,643.00
Sum = $5,973,871.00
20081AllenOn TxDOT Road System
FM 1378
Rockridge RoadSouth of Stacy Rd.
Engineering and Construction
Reconstruct 2 lane roadway to a 6 lane roadway

 
26
$6,967,339.00
$5,573,871.00
$1,393,468.00
All parties (TxDOT, Allen, Fairview, County and LAN) are working on an agreement to start preliminary design and Enviromental document and continue onto the PS&E.
http://maps.collincountytx.gov/rtrbond.html?rtr=20081
12/14/2010 1:06 PM
BONANZA\gabriela
20082AllenOn TxDOT Road System
Stacy Road
Angel ParkwayFM 1378
Engineering and Construction
Reconstruct 2 lane roadway to a 4 lane divided roadway

 
24
$8,227,689.00
$6,279,643.00
$400,000.00
$1,548,046.00
TxDOT is doing Design in House. Schematic has been approved. Env. Document in Final Stages. Should be cleared by FHWA witin the month. Let date is Sept 2012. 2007 Collin County bond funds available ($490,000)
http://maps.collincountytx.gov/rtrbond.html?rtr=20082
12/14/2010 1:06 PM
BONANZA\gabriela

Expand/Collapse Managing Entity : Collin County ‎(2)
Sum =
Sum = $18,233,598.46
Sum = $19,463,905.00
Sum =
20075Collin CountyOff TxDOT Road System
FM 1378
FM 544FM 3412
Construction Only
Realign on new location and widen existing 2 lane to 6 lane divided.
26
$3,233,598.46
$7,463,905.00
$1,865,976.00
RTR FUNDING RECEIVED. ILA approved with City of Wylie and funds in the amount of $3.233.598.46 were sent to Wylie on 7-30-2010. Construction is underway and being managed by the City of Wylie.  Bond project #99-102 funded this for Engineering.
 
1/11/2011: The City did a final walk through on the project a couple of weeks ago.  TxDOT opens the entire roadway in March.  
 
The Construction cost came under the approved RTR dollars so savings will be reallocated to other projects.
http://maps.collincountytx.gov/rtrbond.html?rtr=20075
1/18/2011 1:57 PM
Tracy Homfeld
20089Collin CountyOff TxDOT Road System
Outer Loop
US 75SH 121
Construction Only
Construct new two lane service road
02
$15,000,000.00
$12,000,000.00
$3,000,000.00
COMPLETE
Design by HNTB is complete. Pre bid meeting was held on Oct. 6, 2010.  Bond funds available in the amount of $5,025,000 #07-094. 
http://maps.collincountytx.gov/rtrbond.html?rtr=20089
12/14/2010 1:06 PM
BONANZA\gabriela

Expand/Collapse Managing Entity : DART ‎(2)
Sum =
Sum = $14,403,750.00
Sum = $8,915,000.00
Sum =
11141.2DARTOff TxDOT Road System
PGBT Light Rail Station area at George Bush LRT Station Area
Construction Only
Surface Parking expansion to include 380 more parking spaces
$1,703,750.00
$415,000.00
$103,750.00
Other funds in the amount of $1,185,000 avail. for this project.
12/14/2010 1:06 PM
BONANZA\gabriela
20069DARTOff TxDOT Road System
Northwest Plano Park and Ride Lot
West Side of North Dallas Tollway(Between) Tennyson Pkwy and Spring Creek Pkwy
Park and Ride
Provide 544 (ultimately 716) space DART Park and Ride facility. Funding is for Construction.
$12,700,000.00
$8,500,000.00
$4,200,000.00
http://maps.collincountytx.gov/rtrbond.html?rtr=20069
12/14/2010 1:06 PM
BONANZA\gabriela

Expand/Collapse Managing Entity : Frisco ‎(3)
Sum =
Sum = $18,287,024.00
Sum = $17,481,112.00
Sum =
20086FriscoOn TxDOT Road System
SH 121 Frontage Road at Ohio Drive
Intersection Improvement
Design and construct a right turn bay on the South bound frontage road of SH 121 at Ohio Drive

 
$294,468.00
$235,574.00
$58,894.00
Local Let by City of Frisco. TxDOT will handle permitting on frontage rds. Estimated Let date for this project is Nov 2013.  
http://maps.collincountytx.gov/rtrbond.html?rtr=20086
12/14/2010 1:06 PM
BONANZA\gabriela
20087FriscoOn TxDOT Road System
SH 289 (Preston Rd.)
SH 121FM 3537
Intersection Improvement
Add turning bays at intersections; signal improvements, add ADA compliant ramps, and pedestrian signals
 
 
$3,735,085.00
$2,988,067.00
$747,018.00
Frisco to manage for TxDOT through agreement. Estimated Let date for this project is Aug 2013.  
http://maps.collincountytx.gov/rtrbond.html?rtr=20087
12/14/2010 1:06 PM
BONANZA\gabriela
20207FriscoOff TxDOT Road System
Stonebrook Parkway
Legacy DriveLonghorn Trail
Construction Only
CONSTRUCT 2 LANE RURAL DIVIDED ARTERIAL
02
$14,257,471.00
$14,257,471.00
Design Underway
Plans are currently 80% complete
http://maps.collincountytx.gov/rtrbond.html?rtr=20207
12/14/2010 1:06 PM
BONANZA\gabriela

Expand/Collapse Managing Entity : McKinney ‎(1)
Sum =
Sum = $2,344,152.00
Sum = $1,875,321.00
Sum =
20093McKinneyOn TxDOT Road System
McDonald St. (SH 5)
Eldorado Pkwy (FM 546)McDonald (SH 5) at Tennessee, From 1000 ft in each direction.
Intersection Improvement
ADD RIGHT TURN LANES IN EACH DIRECTION AT THE INTERSECTION; AND ADD RAISED MEDIAN TO THE INTERSECTION OF MCDONALD STREET/SH 5 AT TENNESSEE STREET
 

 
$2,344,152.00
$1,875,321.00
$468,831.00
TxDOT is going Design in house. Let date of Aug 2011.   Schematic submittal is forthcoming.
http://maps.collincountytx.gov/rtrbond.html?rtr=20093
12/14/2010 1:06 PM
BONANZA\gabriela

Expand/Collapse Managing Entity : North Central Texas Council of Governments ‎(4)
Sum = 55.00
Sum = $10,000,000.00
Sum = $7,500,000.00
Sum = $500,000.00
20053North Central Texas Council of GovernmentsOff TxDOT Road System
DART LRT (Red Line) at Parker Road Station
Transit
PHASE 1 - LIGHT RAIL. Project Incldes Engineering/Planning.
$625,000.00
$500,000.00
$125,000.00
Preliminary Engineering underway. Fund Phase 1; Fixed Funded; planning work for DART's red line from City of McKinney to City of Anna to be funded under regular UPWP planning studies.
http://maps.collincountytx.gov/rtrbond.html?rtr=20053
12/14/2010 1:06 PM
BONANZA\gabriela
20054North Central Texas Council of GovernmentsOff TxDOT Road System
Cotton Belt Passenger Rail
DFW International AirportNorth Central / Red line (Colin County Section)
Transit
TRANSIT - PROVIDE A KEY EAST-WEST PASSENGER RAIL LINK ACROSS THE NORTHERN PART OF THE DART SERVICE AREA

 
$1,250,000.00
$1,000,000.00
$250,000.00
Preliminary Engineering Underway.
http://maps.collincountytx.gov/rtrbond.html?rtr=20054
12/14/2010 1:06 PM
BONANZA\gabriela
20070North Central Texas Council of GovernmentsOff TxDOT Road System
BNSF Passenger Rail
Denton / Collin County lineNorth Frisco (Collin County Section)
Transit
PHASE 1 - RAIL TRANSIT (PASSENGER RAIL)
$1,875,000.00
$1,500,000.00
$375,000.00
Preliminary Engineering Underway.
http://maps.collincountytx.gov/rtrbond.html?rtr=20070
12/14/2010 1:06 PM
BONANZA\gabriela
20088North Central Texas Council of GovernmentsOff TxDOT Road System
Outer Loop
Denton County LineRockwall County Line
55.00
Engineering Only
Environmental clearance for construction of Outer Loop
$6,250,000.00
$5,000,000.00
$1,250,000.00
NCTCOG has completed the Locally approved Environemental document for Segment 1 (US 75 - SH 121). It was approved by the Collin County Toll Road Authority Summer 2010. COG is currently working on the Env. Document for Seg 3 (Denton County Line to US 75). 
http://maps.collincountytx.gov/rtrbond.html?rtr=20088
12/14/2010 1:06 PM
BONANZA\gabriela

Expand/Collapse Managing Entity : Plano ‎(8)
Sum =
Sum = $24,991,566.00
Sum = $16,045,038.00
Sum = $4,326,400.00
20050PlanoOff TxDOT Road System
Spring Creek Parkway
@ Independence Pkwy, Custer Rd and US 75 (Service Rd.)
Intersection Improvement
Dual left lanes, Dedicated right lanes, consolidate split intersections into a normalized intersection. Funding is for Engineering and Construction.
 
$3,029,934.00
$2,423,947.00
$605,987.00
Plano is negotiating consulting engineering contract.
http://maps.collincountytx.gov/rtrbond.html?rtr=20050
12/14/2010 1:06 PM
BONANZA\gabriela
20056PlanoOff TxDOT Road System
14th Street
K AvenueRidgewood Dr.
Construction Only
Reconstruct existing 4 lane divided and 6 lane divided road sections. Project Funding Includes Right-of-Way and Construction.

 
4/64/6
$7,354,880.00
$5,883,904.00
$1,470,976.00
Design by Teage, Nall and Perkins. Engineering is complete. Construction began in March 2010 and will be completed in 16 months. The north side paving from K to Jupiter is almost completed and traffic will be switched in November 2010. Collin County ILA reallocated $1,550,000 from US 75 Ramps. Will reallocate $900,000 from the 2007 bond project to another project. This is available for local contribution. 
http://maps.collincountytx.gov/rtrbond.html?rtr=20056
12/14/2010 1:06 PM
BONANZA\gabriela
20058PlanoOff TxDOT Road System
Parker Rd.
@ Coit, Independence Pkwy and Alma Rd.
Intersection Improvement
Funding for Engineering, Right-of-Way and Construction. Project will include Adding Dual left Lanes.
$1,734,842.00
$1,387,874.00
$346,968.00
Preliminary Engineering for schematic is underway.
http://maps.collincountytx.gov/rtrbond.html?rtr=20058
12/14/2010 1:06 PM
BONANZA\gabriela
20059PlanoOff TxDOT Road System
Park Blvd.
Coit Rd.Jupiter Road
Intersection Improvement
Add dual left lanes, right lanes, remove road hump, maximize left lane lengths. Project includes funding for Engineering, Right-of-Way and Construction.

 
$2,347,097.00
$1,877,677.00
$469,420.00
The schematic and egineering contract have been approved by the Plano city council. The consultant is beginning design.
http://maps.collincountytx.gov/rtrbond.html?rtr=20059
12/14/2010 1:06 PM
BONANZA\gabriela
20060PlanoOff TxDOT Road System
Legacy Dr.
Custer Rd.K Avenue
Intersection Improvement
Add right turn lanes and dual left turn lanes. Funding is for the Engineering, Right-of-way and Construction.

 
$1,454,225.00
$1,163,380.00
$290,845.00
The City of Plano is working with the engineering consultant on a contract for the schematic.
http://maps.collincountytx.gov/rtrbond.html?rtr=20060
12/14/2010 1:06 PM
BONANZA\gabriela
20061PlanoOff TxDOT Road System
Independence Pkwy
15th St.Parker Rd.
Intersection Improvement
Realign traffic lanes to increase traffic flow, optimize signal timing, add right lanes. Funds are for Engineering, Right-of-Way and Construction.

 
$1,771,661.00
$1,417,329.00
$354,332.00
Plano City Council will approve schematic and engineering contract on October 11, 2010.
http://maps.collincountytx.gov/rtrbond.html?rtr=20061
12/14/2010 1:06 PM
BONANZA\gabriela
20063PlanoOff TxDOT Road System
Rasor Rd.
Ohio Dr.SH 121
Construction Only
Widen existing 2 lane sections to 6 lanes and construct East and West sides to complete the 6 lane divided thoroughfare road.
 
$5,408,000.00
$4,326,400.00
$1,081,600.00
Engineering Completed by City using County 2003 Bond Funds
Construction is completed. Collin County Bond Project #03-063 $1,050,000 with an additional reallocation of $330,000 from 03-045 for total county participation in Engineering of ($1,380,000).
http://maps.collincountytx.gov/rtrbond.html?rtr=20063
12/14/2010 1:06 PM
BONANZA\gabriela
29002PlanoOff TxDOT Road System
Local Contribution Credit
Credits from the City of Plano's contribution on SH 121. Placeholder for Future Project.
$1,890,927.00
$1,890,927.00
Project to be identified at a later date.
12/14/2010 1:06 PM
BONANZA\gabriela

Expand/Collapse Managing Entity : Richardson ‎(3)
Sum =
Sum = $4,047,303.00
Sum = $3,237,842.00
Sum =
20051RichardsonOff TxDOT Road System
US 75 @ Renner Rd.
US 75 along Prairie CreekDART Bush Turnpike Station
Bicycle/Pedestrian
Construction of a new 12 foot wide concrete trail.Funding is for Eng. and Construction.

 
$2,434,552.00
$1,947,641.00
$486,911.00
This funding is for Trails B&C. Trail B is under Construction.  Trail C will be under construction by the end of 2010.

 
http://maps.collincountytx.gov/rtrbond.html?rtr=20051
12/14/2010 1:06 PM
BONANZA\gabriela
20052RichardsonOff TxDOT Road System
US 75
Alma Road and SH 190Spring Creek Nature Area and Panther Creek
Bicycle/Pedestrian
Construct 10 to 12 foot wide trail. Construction funding only.
$456,219.00
$364,975.00
$91,244.00
Under construction
This funding is for Trails A&B. Currently Under Construction.
http://maps.collincountytx.gov/rtrbond.html?rtr=20052
12/14/2010 1:06 PM
BONANZA\gabriela
20068RichardsonOff TxDOT Road System
Renner Rd.
@ Alma, @ Jupiter (from Alma Dr.), @ SH 190 (to Jupiter at SH 190/PGBT)
Intersection Improvement
Additional left turn lanes and/or a right turn bay. Funding includes Engineering, Right-of-way and Construction.

 
$1,156,532.00
$925,226.00
$231,306.00
Ongoing
Design is underway.
http://maps.collincountytx.gov/rtrbond.html?rtr=20068
12/14/2010 1:06 PM
BONANZA\gabriela

Expand/Collapse Managing Entity : TxDOT Dallas ‎(41)
Sum =
Sum = $1,048,160,512.00
Sum = $521,568,732.00
Sum = $325,878,160.00
11540TxDOT DallasOn TxDOT Road System
US 75
@ Parker Rd.
Intersection Improvement
Reconstruct interchange as single point urban interchange
TxDOT CSJ# 0047-06-134
$24,348,556.00
$17,083,845.00
$0.00
This has other funds in the amount of $7,264,711.
 
Under construction. Expected completeion date is Dec 2010. County Bond Project #03-046 participated $6,000,000. $2,684,711 sent directly to TxDOT on 3-27-08. The remainder to City of Plano.


http://maps.collincountytx.gov/rtrbond.html?rtr=11540
12/14/2010 1:06 PM
BONANZA\gabriela
11716TxDOT DallasOn TxDOT Road System
US 75
PGBTPark Blvd.
Engineering and Construction
WIDEN DIRECT CONNECT RAMPS FROM PGBT TO NB US 75 AND FROM SB US 75 TO THE PGBT; WIDEN THE DART RR BRIDGE AND PLANO PARKWAY BRIDGE UNDERPASSES; CONSTRUCT AN AUXILIARY LANE ON NB US 75 TO THE PARK BOULEVARD EXIT RAMP.
 
TxDOT CSJ# 0047-06-133 
$25,920,000.00
$14,970,000.00
$1,500,000.00
$2,500,000.00
This project has other funds in the amount of $6,950,000
 
Trans-Systems is doing Design.  Schematic is under MAJOR Revision.  Let Date Sept 2012.
http://maps.collincountytx.gov/rtrbond.html?rtr=11716
12/14/2010 1:06 PM
BONANZA\gabriela
11718TxDOT DallasOn TxDOT Road System
SH 78
Dallas Collin County LineSpring Creek Parkway
Engineering and Construction
Widen 4 lane divided urban to 6 lane divided urban. TXDOT CSJ# 0281-02-060
46
$10,527,846.00
$5,084,600.00
$500,000.00
$1,365,569.00
This project has other funds in the amount of $3,577,677.
 
Currently under construction.  
http://maps.collincountytx.gov/rtrbond.html?rtr=11718
12/14/2010 1:06 PM
BONANZA\gabriela
11719.1TxDOT DallasOn TxDOT Road System
FM 2786 Stacy Road
SH 5East of Angel Parkway
Construction Only
WIDEN 2 TO 4 LANE DIVIDED WITH INTERSECTION IMPROVEMENTS AT FM 2786 AND US 75, GREENVILLE RD, ANGEL PKWAY. TxDOT CSJ# 3392-01-008
24
$6,789,040.00
$2,250,000.00
$4,539,040.00
Still waiting on the Environmental Assessment (EA) document to go to the Federal Highway Administration (FHWA). Should be within the month. Will Let with Stacy Road from Angel to FM 1378 in Sept 2012.
http://maps.collincountytx.gov/rtrbond.html?rtr=11719.1
12/14/2010 1:06 PM
BONANZA\gabriela
11728TxDOT DallasOn TxDOT Road System
FM 2478 (Custer Rd.)
US 380Stonebridge Drive
Construction Only
WIDEN RURAL 2 LANE UNDIVIDED TO 6 LANE URBAN DIVIDED; EXPAND INTERSECTION INCLUDING LEFT TURN LANES; AND INTERSECTION IMPROVEMENTS AT US 380 AND FM 2478/CUSTER RD. TxDOT CSJ# 2351-01-013
26
$15,479,000.00
$3,200,000.00
Other funds in the amount of $12,279,000 are available for this project. (Collin County participated $6,250,000 through bond project #03-035 and $2,800,000 through bond project #07-035. A total of $9,050,000 was sent to City of McKinney in Oct. 2008.)
 
Under Construction. Expected completion date early 2012.
 
http://maps.collincountytx.gov/rtrbond.html?rtr=11728
12/14/2010 1:06 PM
BONANZA\gabriela
20008TxDOT DallasOn TxDOT Road System
FM 3537 (Main St)
Preston Rd. (SH 289)Custer Rd. (FM 2478)
Engineering and Construction
Widen 2 lane Rural to 6 lane Divided Urban Highway.
 
TxDOT CSJ# 0135-12-025
26
$28,475,353.00
$28,245,353.00
$230,000.00
90% Complete
Design is 90% complete.  TxDOT is waiting on Right Of Way to proceed.  Let date is June 2011.
http://maps.collincountytx.gov/rtrbond.html?rtr=20008
12/14/2010 1:06 PM
BONANZA\gabriela
20012TxDOT DallasOn TxDOT Road System
US 380
East of Dallas North TollwayCoit Road (CR 72 / CR 74)
Engineering and Construction
WIDEN 4 TO 6 LANES DIVIDED; ADD NEW 4/6 LANE ACCESS ROADS AT GRADE SEPARATION; CONSTRUCT GRADE SEPARATION AT US 380 AND SH 289. CSJ# 0135-02-044
46
$63,853,150.00
$51,082,520.00
$12,770,630.00
Collin County is managing the AECOM Preliminary Engineering contract.  Had a Value Engineering Study to discuss alternatives for the Schematic in Sept. 2009. Public meeting was held in July 2010.
http://maps.collincountytx.gov/rtrbond.html?rtr=20012
12/14/2010 1:06 PM
BONANZA\gabriela
20013TxDOT DallasOn TxDOT Road System
US 380
West of CR 26 (Denton County Line)East of Dallas North Tollway
Engineering and Construction
WIDEN 4 TO 6 LANES DIVIDED, ADD NEW 4/6 LANE ACCESS ROADS AT GRADE SEPARATION; CONSTRUCT GRADE SEPARATION AT US 380 AND DNT. TxDOT CSJ# 0135-11-018
46
$34,489,648.00
$27,591,719.00
$6,897,929.00
Had a Value Engineering Study to discuss alternatives for the Schematic in Sept. 2009. Collin County is managing the AECOM preliminary Engineering contract.  (LAN doing grade separation at SH 289 final design).
http://maps.collincountytx.gov/rtrbond.html?rtr=20013
12/14/2010 1:06 PM
BONANZA\gabriela
20014TxDOT DallasOn TxDOT Road System
SH 78
Business 78FM 6
Engineering and Construction
Widen 2 Lane Rural to 6 Lane Urban Divided. TxDOT CSJ#0281-01-030
 
26
$15,124,855.00
$15,124,855.00
Let date is April 2012.  TxDOT is doing final Engineering in house at the District Office. Project will Let with CSJ# 0281-02-063 (SH 78 from SH 205 to Business SH 78). Final Plan are 45% complete
http://maps.collincountytx.gov/rtrbond.html?rtr=20014
12/14/2010 1:06 PM
BONANZA\gabriela
20019TxDOT DallasOn TxDOT Road System
US 75
Legacy Dr.Spur 399 / SH 121 South
Engineering and Construction
WIDEN 6 TO 8 MAINLANES AND 2 TO 3 FRONTAGE ROADS. TxDOT CSJ# 0047-06-139
 
68
$78,842,561.00
$63,074,049.00
$15,768,512.00
Preliminary Design Meetings to discuss Scope for the schematic have been held.  TxDOT is going to hire a consultant to do the Engineering. Little Right of Way will be required.  The Let date is Sept 2012.
http://maps.collincountytx.gov/rtrbond.html?rtr=20019
12/14/2010 1:06 PM
BONANZA\gabriela
20020TxDOT DallasOn TxDOT Road System
US 75
Spur 399 (SH 121 south)Wilson Creek
Construction Only
RECONSTRUCT AND WIDEN FROM 4 TO 8 LANES WITH 2 HOV CONCURRENT LANES AND 3 LANE FRONTAGE ROADS. TxDOT CSJ# 0047-06-108
48
$54,185,305.00
$48,368,244.00
$5,817,061.00
HDR is doing Design.  Let date is March 2011.
http://maps.collincountytx.gov/rtrbond.html?rtr=20020
12/14/2010 1:06 PM
BONANZA\gabriela
20021TxDOT DallasOn TxDOT Road System
US 75
South of Bloomdale RoadNorth of US 380
Engineering and Construction
RECONSTRUCT AND WIDEN FROM 4 LANES TO 8 LANES; RECONSTRUCT FRONTAGE ROADS FROM 2 LANES TO 3 LANES. TxDOT CSJ# 0047-14-065
48
$44,650,000.00
$31,380,000.00
$7,720,000.00
Additional funds in the amount of $5,550,000 available for this project.
 
Already Let (May 2010) is effectively under construction, but contractor has not broke ground yet.
http://maps.collincountytx.gov/rtrbond.html?rtr=20021
12/14/2010 1:06 PM
BONANZA\gabriela
20022TxDOT DallasOn TxDOT Road System
SH 78
SH 205Business 78
Engineering and Construction
Widen 2 Lane Rural to 6 Lane Divided Urban. TxDOT CSJ#0281-02-063
26
$20,485,446.00
$20,485,446.00
Let date is April 2012.  TxDOT is doing Final Engineering in house. (District Office) Will let with 0281-01-030, The Final Engineering Plans are at 45% complete.
http://maps.collincountytx.gov/rtrbond.html?rtr=20022
12/14/2010 1:06 PM
BONANZA\gabriela
20031TxDOT DallasOn TxDOT Road System
US 75
Wilson CreekUS 380
Engineering and Construction
RECONSTRUCT FROM 4 TO 8 LANES; RECONSTRUCT FRONTAGE ROADS FROM 2 LANES TO 2/3 LANES. TxDOT CSJ# 0047-14-046.
48
$49,422,238.00
$39,537,790.00
$7,016,605.00
Other funds in the amount of $2,867,843 are available for this project.
 
HDR is doing Design.  Let date is March 2011.
http://maps.collincountytx.gov/rtrbond.html?rtr=20031
12/14/2010 1:06 PM
BONANZA\gabriela
20032TxDOT DallasOn TxDOT Road System
FM 455
US 75 Northbound Frontage Rd.SH 5
Engineering and Construction
Widen 2 lane rural to 4 lane (ultimate 6 lane) urban roadway. TxDOT CSJ# 0816-04-044
24/6
$14,090,554.00
$8,372,443.00
$3,200,000.00
$2,518,111.00
Collin County is managing the design contract with Dannenbaum Engineering.  Project was Environmentally cleared summer 2010. Dannenbaum is doing Final Design. Just submitted 30% for review. Let date is June 2012. 
http://maps.collincountytx.gov/rtrbond.html?rtr=20032
12/14/2010 1:06 PM
BONANZA\gabriela
20033TxDOT DallasOn TxDOT Road System
SH 289 (Preston Rd.)
US 380Panther Creek
Construction Only
Reconstruct and widen 2 lane rural highway to 6 lane divided urban. TxDOT CSJ: 0091-04-041
26
$22,210,993.00
$18,131,423.00
$2,266,428.00
Other funds in the amount of $1,813,142.
 
Under construction. Expected completion date is early 2012.
http://maps.collincountytx.gov/rtrbond.html?rtr=20033
12/14/2010 1:06 PM
BONANZA\gabriela
20034TxDOT DallasOn TxDOT Road System
SH 289 (Preston Rd.)
Panther CreekFM 3537
Construction Only
Reconstruct and widen 2 lane rural highway to 6 lane divided urban. TxDOT CSJ# 0091-05-041

 
26
$10,279,541.00
$5,669,315.00
$3,000,000.00
$708,665.00
Other funds in the amount of $901,561 available.
 
Under construction. Expected completion date is early 2012
http://maps.collincountytx.gov/rtrbond.html?rtr=20034
12/14/2010 1:06 PM
BONANZA\gabriela
20035TxDOT DallasOn TxDOT Road System
FM 2551 (Murphy Rd.)
FM 544FM 2514
Engineering and Construction
Reconstruct and widen 2 lane rural to 6 lane urban. TxDOT CSJ# 2056-01-045
26
$21,574,891.00
$15,377,288.00
$6,072,603.00
this project has other funds in the amount of $125,000.
 
Currently Under Design. ENV. on hold in Austin due to ROW issues. City of Murphy working with Half Assoc to resolve issues. Collin County Managing Eng. with CP&Y. Have recently started back up with design. ENV. Clearance is expected soon.
http://maps.collincountytx.gov/rtrbond.html?rtr=20035
12/14/2010 1:06 PM
BONANZA\gabriela
20036TxDOT DallasOn TxDOT Road System
SH 78
Spring Creek PkwySH 205
Engineering and Construction
RECONSTRUCT AND WIDEN 2 LANE TO 6 LANE URBAN. txDOT CSJ# 0281-02-039
26
$27,429,047.00
$17,303,238.00
$10,125,809.00
Design is being done by Jacobs Consulting Engineers. Public Hearing was held 07-29-10. The Let date is June 2012. Plans are currently at 70% complete.
http://maps.collincountytx.gov/rtrbond.html?rtr=20036
12/14/2010 1:06 PM
BONANZA\gabriela
20055TxDOT DallasOn TxDOT Road System
SH 289 (Preston Rd) at
PGBT
Engineering and Construction
WIDEN PRESTON RD BRIDGE OVER PGBT TO PROVIDE 2 LEFT TURNS AND 1 DEDICATED SB RIGHT TURN LANE FOR PGBT ENTRANCE RAMPS. TxDOT CSJ# 0091-05-059
$3,471,850.00
$2,777,480.00
$694,370.00
Let date is Oct 2012. TxDOT is preparing LPAFA with the City of Plano.  County Bond Project 07-060 with Plano has $600,000 available for local funding match.
http://maps.collincountytx.gov/rtrbond.html?rtr=20055
12/14/2010 1:06 PM
BONANZA\gabriela
20057TxDOT DallasOn TxDOT Road System
SH 289 at
HEADQUARTERS ROAD, HEDGCOXE ROAD, SPRING CREEK PARKWAY
Engineering and Construction
ADD DUAL LEFT LANES AND DEDICATED RIGHT LANES. TxDOT CSJ# 0091-05-057
$3,257,952.00
$2,606,362.00
$651,590.00
Huitt-Zollars has started schematic and its sub Civil Associates has started environmental work. Jan. 2012 letting.
http://maps.collincountytx.gov/rtrbond.html?rtr=20057
12/14/2010 1:06 PM
BONANZA\gabriela
20076TxDOT DallasOn TxDOT Road System
SH 121
FM 455Fannin County Line
Engineering Only
Engineering only for widening of 2 lane rural highway to 4 lane divided roadway. TxDOT CSJ# 0549-03-021
24
$6,250,000.00
$5,000,000.00
$1,250,000.00
Collin County managed the Preliminary Engineering contract with LAN. The did the Schematic and ROW map in being developed. CC Bond Project #07-105. Final Design is not underway.  Let date is 2020.
http://maps.collincountytx.gov/rtrbond.html?rtr=20076
12/14/2010 1:06 PM
BONANZA\gabriela
20083TxDOT DallasOn TxDOT Road System
FM 2514
FM 2551FM 1378
Engineering and Construction
Widen 2 lane rural to 4 lane (ultimate 6 lane) urban roadway. TxDOT CSJ# 2679-02-008
24
$23,102,357.00
$18,138,686.00
$4,963,671.00
Collin County is manging the preliminary Engineering, Bond Project #99-00-17 with Birkhoff, Hendricks and Carter doing  preliminary Design and EA document. Had a Design meeting Sept 2, 2010 regarding the need for a Public Meeting and Schematic changes (shifting alignment to avoid existing waterline and easement).
http://maps.collincountytx.gov/rtrbond.html?rtr=20083
12/14/2010 1:06 PM
BONANZA\gabriela
20084TxDOT DallasOn TxDOT Road System
US 75
Outer Loop (CR 366)Grayson County Line
Engineering Only
ENGINEERING FOR RECONSTRUCTION OF MAINLANES FROM 4 TO 6 LANES; RECONSTRUCT 2 LANE FRONTAGE ROADS. txDOT CSj# 0047-14-053
46
$6,250,000.00
$5,000,000.00
$1,250,000.00
RTR funded for Preliminary Engineering only, no construction dollars.  Design has not started.
http://maps.collincountytx.gov/rtrbond.html?rtr=20084
12/14/2010 1:06 PM
BONANZA\gabriela
20085TxDOT DallasOn TxDOT Road System
SH 5
SH 121FM 455
Engineering Only
Engineering for reconstruction of mainlanes. TxDOT CSJ# 0047-04-022 
$2,800,000.00
$2,000,000.00
$240,000.00
$560,000.00
RTR funded for Preliminary Engineering only, no construction dollars.  Design has not began.
http://maps.collincountytx.gov/rtrbond.html?rtr=20085
12/14/2010 1:06 PM
BONANZA\gabriela
20091TxDOT DallasOn TxDOT Road System
US 380
Bois D' Arc1000' west of Lake Forest Dr.
Engineering and Construction
Widen existing 4 lane divided urban arterial to a 6 lane divided cross section. TxDOT CSJ# 0135-02-046
 

 
46
$9,865,371.00
$7,892,297.00
$1,973,074.00
TxDOT in house design. Let Feb 2011, No ROW needed. TxDOT will be at 95% Plans mid Sept. 2010.
http://maps.collincountytx.gov/rtrbond.html?rtr=20091
12/14/2010 1:06 PM
BONANZA\gabriela
20092TxDOT DallasOn TxDOT Road System
US 380
500' east of Custer Rd. (FM 2478)1000' east of Lake Forest Drive
Engineering and Construction
Widen existing 5 lane undivided rural arterial to a 6 lane divided cross section.
 
TxDOT CSJ# 0135-02-045
 

 
56
$26,891,421.00
$22,389,527.00
$4,501,894.00
TxDOT is doing design in house.  Project will be let in  July 2011. No Right od Way is needed.  Will submit 60% plans mid November 2010.
http://maps.collincountytx.gov/rtrbond.html?rtr=20092
12/14/2010 1:06 PM
BONANZA\gabriela
20095TxDOT DallasOn TxDOT Road System
US 75
Wilson CreekUS 380
Intellegent Transportation System
Extend existing ITS network. TxDOT CSJ# 0047-14-066

 
$2,270,000.00
$1,816,000.00
$454,000.00
Project was let in July 2010. Currently under construction.

 
http://maps.collincountytx.gov/rtrbond.html?rtr=20095
12/14/2010 1:06 PM
BONANZA\gabriela
20098TxDOT DallasOn TxDOT Road System
US 75
Exchange PkwyEldorado Pkwy
Intellegent Transportation System
US 75 From Exchange Parkway To Eldorado Parkway. TxDOT CSJ# 0047-06-144

 
$2,960,000.00
$2,368,000.00
$592,000.00
Project was let July 2010. Curretnly under construction.

 
http://maps.collincountytx.gov/rtrbond.html?rtr=20098
12/14/2010 1:06 PM
BONANZA\gabriela
20176TxDOT DallasOn TxDOT Road System
SH 121
SH 5FM 455
Engineering and Construction
Widen 2 lane rural highway to 4 lane divided roadway. TxDOT CSJ# 0549-03-018
24
$38,825,660.00
$31,580,528.00
$7,245,132.00
SH 121 from US 75 to SH 5 will be widened with construction of US 75. Collin County Managed Prelim Design as Collin County Bond project # 07-105. LAN did Schematic and ROW map is being developed.   TxDOT in house Final Design (District Office) working on 30% plans now.   Let date Nov. 2012.   Public Hearing will be scheduled in the near future.
http://maps.collincountytx.gov/rtrbond.html?rtr=20176
12/15/2010 4:41 PM
BONANZA\gabriela
20179TxDOT DallasOn TxDOT Road System
SH 289
FM 455North Business 289C, North of Celina
Engineering and Construction
WIDEN RURAL TWO LANE HIGHWAY TO SIX LANE URBAN DIVIDED. TxDOT CSJ: 0091-03-021
26
$8,660,890.00
$6,928,712.00
$1,732,178.00
Collin County managed Prelim. Engineering (LAN). TxDOT is doing in house Final Design (District Office). Let Date Oct 2011.  Plans are near 30%. Public Hearing was held July 22nd, 2010.
http://maps.collincountytx.gov/rtrbond.html?rtr=20179
12/14/2010 1:06 PM
BONANZA\gabriela
20184TxDOT DallasOn TxDOT Road System
US 380
.929 miles west of CR 557 (Lake Lavon)West of CR 608 in Farmersville, TX
Construction Only
WIDEN EXISTING RURAL 2 LANE HIGHWAY TO 4 LANE DIVIDED. TxDOT CSJ# 0135-04-028
24
$27,500,000.00
$27,500,000.00
East Phase I, under construction.  Expected completion is April 2011.
http://maps.collincountytx.gov/rtrbond.html?rtr=20184
12/14/2010 1:06 PM
BONANZA\gabriela
20197TxDOT DallasOn TxDOT Road System
US 75
Telephone Road (CR 275)Melissa Road
Engineering and Construction
RECONSTRUCT AND WIDEN 4 LANE TO 6 LANES AND 2 LANE FRONTAGE ROADS EACH DIRECTION.
TxDOT CSJ# 0047-14-068
 
46
$47,351,374.00
$39,141,099.00
$8,210,275.00
On going Selection process for Engineering Consultant.
 
http://maps.collincountytx.gov/rtrbond.html?rtr=20197
12/14/2010 1:06 PM
BONANZA\gabriela
20198TxDOT DallasOn TxDOT Road System
US 75
Melissa RoadOuter Loop
Engineering and Construction
RECONSTRUCT AND WIDEN 4 LANE TO 8 LANES AND 3 LANE FRONTAGE ROADS EACH DIRECTION.
TxDOT CSJ#0047-14-069
48
$46,551,373.00
$38,341,098.00
$8,210,275.00
Funding under question and review.
http://maps.collincountytx.gov/rtrbond.html?rtr=20198
12/14/2010 1:06 PM
BONANZA\gabriela
20201TxDOT DallasOn TxDOT Road System
US 75 HOV ACCESS RAMPS STUDY
FROM DALLAS COUNTY LINEH 121 / SPUR 399
Engineering Only
HOV ACCESS RAMPS STUDY. TxDOT CSJ# 0047-06-145
$500,000.00
$500,000.00
http://maps.collincountytx.gov/rtrbond.html?rtr=20201
12/15/2010 4:42 PM
BONANZA\gabriela
20202TxDOT DallasOn TxDOT Road System
SH 289 (Preston Rd.)
US 380 InterchangeNorth of FM 1461 / BS 289D
Engineering and Construction
RECONSTRUCT AND WIDEN TWO LANE RURAL HIGHWAY TO SIX LANE DIVIDED URBAN ROADWAY.
 
TxDOT CSJ# 0091-04-050

 
26
$32,325,481.00
$25,647,878.00
$6,677,603.00
Collin County Managed Preliminary Design (LAN). TxDOT is doing in house Final Design (District Office). Let Date July 2011.  Final plans near 60%. Public Hearing was held July 22nd, 2010.
http://maps.collincountytx.gov/rtrbond.html?rtr=20202
12/15/2010 4:42 PM
BONANZA\gabriela
20203TxDOT DallasOn TxDOT Road System
SH 289
North of FM 1461 / BS 289DFM 455 in Celina
Engineering and Construction
RECONSTRUCT AND WIDEN TWO LANE RURAL HIGHWAY TO SIX LANE DIVIDED URBAN ROADWAY.
 
TxDOT CSJ# 0091-04-055
26
$34,750,000.00
$27,850,000.00
Collin County Managed Preliminary Design (LAN). TxDOT is doing Final Design in house at the District Office. Let Date is July 2011.  Plans are near 60%.  Public Hearing was held July 22nd, 2010
http://maps.collincountytx.gov/rtrbond.html?rtr=20203
12/14/2010 1:06 PM
BONANZA\gabriela
20204TxDOT DallasOn TxDOT Road System
SH 289
at US 380 Interchange
Engineering and Construction
REPLACE OVERPASS AND APPROACHES. TxDOT CSJ# 0091-04-054
$19,100,000.00
$16,000,000.00
$3,100,000.00
LAN doing final design through Collin County.  Let date is Nov 2011.  Plans are in Austin and LAN is working on revisions now.  On track for Nov 2011 letting. Public Hearing was held on July 15th, 2010. EA is clear.
http://maps.collincountytx.gov/rtrbond.html?rtr=20204
12/14/2010 1:06 PM
BONANZA\gabriela
20205TxDOT DallasOn TxDOT Road System
US 380
EAST OF FLOYD STREETCR 698 (HUNT COUNTY LINE)
Engineering and Construction
RECONSTRUCT EXISTING  RURAL 2 LANE HIGHWAY TO 4 LANE DIVIDED. TxDOT CSJ# 0135-05-023
24
$26,810,340.00
$21,083,494.00
Other funds in the amount of $5,726,846 are available for this project. East Phase II. Project Let July 2010.  Under delayed start waiting on utilities.  Should start construction soon.
http://maps.collincountytx.gov/rtrbond.html?rtr=20205
12/14/2010 1:06 PM
BONANZA\gabriela
20206TxDOT DallasOn TxDOT Road System
US 380
WEST OF CR 608 IN FARMERSVILLEEAST OF FLOYD ST
Engineering and Construction
WIDEN EXISTING 2 LANE RURAL HIGHWAY TO 4 LANE DIVIDED, INCLUDING RAILROAD CROSSING. TxDOT CSJ# 0135-05-025.
24
$15,388,419.00
$15,387,794.00
Other funds in the amount of $625 available for this project.
 
East Phase III, under design revision for Main St Bridge.  On track for a July 2011 letting.
http://maps.collincountytx.gov/rtrbond.html?rtr=20206
12/14/2010 1:06 PM
BONANZA\gabriela
53114TxDOT DallasOn TxDOT Road System
US 75
South of BloomdaleTelephone Rd. (CR 275)
Construction Only
RECONSTRUCT AND WIDEN 4 LANES TO 8 LANES AND 3 LANE FRONTAGE ROADS EACH DIRECTION. TxDOT CSJ#0047-14-067
 
48
$95,100,000.00
$76,600,000.00
$18,500,000.00
Schematic under revision by TxDOT District Office. PS&E under design by Burns and Macdonald Engineering.  Let date Nov 2011.